Last news:

05/30/2014:
Charlie is back to the shore following an injury to a shoulder.
The project is stopped.

*****

05/29/2014:
Departure of Charlie this morning at 10 am (local time) with good conditions. See Pictures-journey.

*****

05/25/2014:

The departure window may be open next wenesday. The code is turning to orange ! 

*****

05/23/2014:
Last dry run before departure (see Pictures-Test), Passenger is full loaded. So far, so good ! Standby begins to be long, we expect  to have a favourable launching window next week.

*****

05/21/2014:
Loading of the boat has begun. Pictures are available on Pictures-Miscelaneous.

*****

05/20/2014:
The tightness defect is fixed. Capsize test performed today are positive. No rowing due to bad weather conditions on the shore (movie link).

*****

05/16/2014:
A capsize test has been performed today. A small tightness defect at a hatch will be fixed this week end.

*****

05/14/2014:
First tests at sea in Canada successfull. Navigation at 1/3 of load, calibration of the navigation system.
Pictures available in the page pictures-tests.

*****

05/13/2014:

Passenger is ready for the training scheduled wenesday.
Some pictures will be posted tomorrow.

*****

05/09/2014:

The website is now online.
The boat has been delivered on monday 5th, last preparations on-going.

*****